If you’re planning to install a swimming pool, understanding the timeline is crucial for setting expectations and scheduling your dream project. The time it takes to build a pool depends on various factors, including the type of pool, design complexity, permitting process, and even weather conditions. This article provides a step-by-step breakdown of the pool construction process, highlighting ways to streamline the experience and ensure success with a reliable contractor like Pools By Jordan.

  1. Type of Pool
    The type of pool you choose plays a significant role in determining the construction timeline:
  1. Permitting Process
    Obtaining permits is an essential step, as local regulations can impact the start date. The permitting process may take anywhere from 2–4 weeks, especially in areas with strict zoning laws.
  2. Design Complexity
    Adding features like waterfalls, tanning ledges, or custom shapes can increase the overall timeline. Simpler designs are faster to build.
  3. Weather Conditions
    Rain or extreme heat can delay critical stages like excavation or concrete pouring.
  4. Contractor Experience
    Partnering with an experienced pool builder like Pools By Jordan ensures efficiency and minimizes delays.
  1. Planning and Design (1–3 Weeks)
    Begin by brainstorming with your pool builder. Consider the shape, depth, and features like lighting or heating systems. A detailed plan helps avoid delays.
  2. Permitting (2–4 Weeks)
    Pool construction cannot start without proper permits. Your contractor will handle this process, but timelines vary by location.
  3. Excavation (1–2 Weeks)
    Once permits are approved, the site is excavated based on the pool’s design. Challenges like underground rocks may add time.
  4. Shell Installation (Varies by Pool Type)
    • Concrete Pools: Rebar frameworks and concrete application require several weeks, with curing taking up to 28 days.
    • Fiberglass Pools: Delivered and installed in days, making this the fastest option.
    • Vinyl Pools: Installation involves assembling walls and fitting the vinyl liner, taking about 1–2 weeks.
  5. Plumbing and Electrical (1–2 Weeks)
    Plumbing, electrical systems, and filtration equipment are installed during this phase, along with water features or heating systems.
  6. Decking and Landscaping (1–3 Weeks)
    Adding decking, tiles, or landscaping enhances your pool area’s beauty and functionality.
  7. Inspection and Filling (1 Week)
    Before the pool is ready for use, it undergoes a final inspection to ensure compliance. Once approved, the pool is filled, and final touches are made.

Pool TypeApproximate Timeline
Concrete Pool8–12 weeks (or longer)
Fiberglass Pool2–5 weeks
Vinyl Pool4–8 weeks

Building a pool is a significant investment, and choosing the right pool contractor is key. With Pools By Jordan, you’ll benefit from:

Let Pools By Jordan turn your backyard into a personal oasis. From planning to final inspection, we handle every detail with care. Contact us today to bring your dream pool to life!